What should I expect from a drywall inspection?

When performing a pre-drywall walk-through, the home inspector may inspect:

  • electrical wiring and junction box placement;
  • framing;
  • foundation slabs, walls and drains;
  • footings;
  • notching of floor joists;
  • firestop material;
  • pier pads;
  • crawlspace;

What must be checked for before drywall is installed?





Read on to learn more.

  1. HVAC Units. Heating, ventilation, and air conditioning — known as HVAC in the construction industry — are something you need to consider during your pre-drywall inspection. …
  2. Plumbing System. …
  3. Dishwasher Issues. …
  4. Electrical Problems. …
  5. Problems With the Floor. …
  6. Wall Issues. …
  7. Roof Problems. …
  8. Foundation Issues.

Is pre-drywall inspection worth it?

Taking pictures before hanging drywall will help you avoid any costly repairs when affixing items to the wall. 4. It can reveal workmanship and materials: While builders have a construction manager who oversees everything, each part is handled by a different subcontractor.

What should I ask at pre-drywall meeting?


Quote from Youtube video: We're going to take a look around make a list of things that we think we want to talk about. And then we'll wait for our builder brian to show up and he'll walk through everything with us and i'm sure

When building a house what comes after drywall?

After drywall has been completed the exterior siding of the home will begin. You will see the brick, stonework, stucco, or whatever your using getting being laid out. Exterior Driveway/Walkway. It is at this point that additional exterior finishes like a garage and outdoor walkways are poured with concrete.

How long does it take to finish a home after drywall?





about two months

Interior finishing.



This is when the inside of your house starts to look like a house, with the drywall and most of the carpentry completed. Expect about two months.

Does drywall go over insulation?

To combat this problem, drywall is required to cover it. Drywall, which is actually a mineral called gypsum, resists fire. It also helps insulate and soundproof the room. The most common way to hang drywall over rigid foam insulation is to glue and screw it into place.

Do you install electrical boxes before drywall?

In contrast to new-work boxes, which are screwed to the wall studs before drywall is hung, old-work boxes are set into existing drywall. They are secured with clamps that are built into the box. Installing a remodeling box is something you can easily do with just a few tools.

How do you prep drywall?



Quote from the video:
Quote from Youtube video: So we'll just let this patch dry for the next day and if it is lower than the surface you can just sand it down bringing it flush to the surface and begin with your paper taping.

What do you put on walls before drywall?

Here’s a checklist of items that need to be installed before the drywall goes up:

  1. Electrical: All wiring and electrical boxes installed for wall outlets, switches, and light fixtures.
  2. Plumbing: Drain lines along with hot and cold water lines.
  3. Heating and Cooling: Any ductwork for room vents and air return.

When did houses start using drywall?

Drywall was invented in 1916. The United States Gypsum Corporation, a company that vertically integrated 30 different gypsum and plaster manufacturing companies 14 years prior, created it to protect homes from urban fires, and marketed it as the poor man’s answer to plaster walls.

What is a frame walk?



A frame walk is one of the key milestones in the new home construction process to verify your electrical, plumbing, and structural options are in place prior to installing the drywall. Because once the drywall goes up, it’s too late to make any changes!

What are the 5 stages of building a house?

6 Major Phases of the Home Building Process

  • Home Building Phase #1: Plans and Permitting. …
  • Home Building Phase #2: The Site Work and Masonry Phase. …
  • Home Building Phase #3: Framing. …
  • Home Building Phase #4: Plumbing, Electric & More. …
  • Home Building Phase #5: Insulation, Drywall & Flooring.

Is sheetrock the same as drywall?

Drywall is a flat panel made of gypsum plaster sandwiched in between two sheets of thick paper. It adheres to metal or wood studs using nails or screws. Sheetrock is a specific brand of drywall sheet. These terms are often used interchangeably.

What is installed first in a new construction?

Stage 1: Site preparation & foundation pour



Footings (structures where the house interfaces with the earth that supports it) are installed. If your home is going to have a well, it will be dug at this point.

What comes first plumbing or flooring?



You will need to install plumbing inside the basement floor. You will need to pour the slab, which is the concrete on the basement floor. This may be called a structural wood floor on some plans depending on your country.

Should you paint a new construction house?

The consensus is to wait more than six and up to 15 months before painting the interior of a newly built house. The reason being that the wood frame, plaster, and other building materials used need time to dry and settle before you can apply paint.

What are the stages of a new build?

Some of the key phrases and stages of construction of your new home are briefly explained here.

  • Foundation. This is the beginning of the construction process. …
  • Superstructure. …
  • First Fix. …
  • Second Fix. …
  • Decoration. …
  • Finals. …
  • External Works. …
  • Familiarisation Visit.

What is 2nd fix on a new build?

The Second Fix may include the following: Your electrician will install face plates on light switches and plug sockets, along with your light fittings. The main fuse board will be connected up allowing all wiring to be tested – all light switches and plug sockets should work and be safe at this stage.

When building a house when do the windows go in?



framing stage

Windows are installed in the framing stage to protect the interior of the home and enclose the shell from the weather.