All other circuits are serviced from the subpanel. My understanding of NEC is that each panel requires two grounding rods at least 6 feet apart.

How do you wire a sub panel in a detached garage?

Quote from the video:
Quote from Youtube video: Started out by removing the drywall above the main house the electrical panel to install the new wire that would lead out to the garage. Luckily.