How do you run a wire through a finished ceiling?

Quote from the video:
Quote from Youtube video: Step 3 drill a hole in the ceiling or floor if you'll be running cable through the ceiling carefully drill a hole with the 1/8 inch drill bit through the ceiling above the new wall box location.

How do you run wires through joists?





The best way to run wires along ceiling joists is to use a running board, spacing the wires evenly with electrical staples. This is for running wires in the direction of the joists or perpendicular to them. If there is no space, you can bore holes in very specific places to run wires through.

Can you drill through ceiling joists for electrical?

You can safely drill joists for electrical and plumbing runs without weakening the joists, if you follow the rules.

Do I need blocking between ceiling joists?

According to Section 6.3: “Rafters and ceiling joists having depth to thickness ratios exceeding 5:1 (e.g., 2×10) need blocking at their points of bearing to prevent rotation or displacing laterally from their intended position …

Can you run wire through ceiling joists?

Running electrical wire through the channel between ceiling joists is generally easiest. In addition, your light fixture may require mounting to a ceiling joist or to two short blocks nailed between the joists. Trace and mark the fixture hole and cut out with a drywall saw, utility knife or reciprocating saw.

Do you have to run wire through joists?





Code says that you may not staple wires to the bottom of a floor joist unless the wire is 6-2, 8-3, or larger. Smaller wires must be run through bored holes or be attached to a running board.

How do you install a block between ceiling joists?

Blocking a ceiling joist is a relatively simple project.

  1. Measure the space between the two ceiling joists. …
  2. Cut a board to match the measurement. …
  3. Position the cut board sideways, between the two joists, and secure it with two 12d nails, inserted from the outsides of the supporting joists, into each end of the board.


Are Strongbacks required?

Even though strongbacks are not required in U.S. applications, they improve performance more effectively than other type of bridging and are recommended for superior floor systems.

How do you add a block between joists?



How do you install a block between floor joists?

  1. Measure the distance between two parallel floor joists– and cut out a solid wood piece of the same length. …
  2. Install the wooden block by hammering down a couple of nails on both sides to attach it to the two parallel joists.

What does joist bridging do?

During construction, the bridging keeps joists vertical so they can’t twist out of place. After construction, for the life of the house, the bridging helps stiffen and strengthen the joists by tying them together so that some of the load on one transfers to neighboring joists.

What is the purpose of blocking between joists?

Blocking or bridging can be used for a variety of purposes in deck building. Probably, the most commonly used technique is to install small pieces of material in a zig-zag pattern between the perimeter joists to create a rigid rim joist that prevents bounce and increases the strength of the rail attachment.

When to use blocking in framing?



So any sheathing edges that don’t land on standard framing (studs, plates, windows/doors) need to be supported by blocking. All edges of wall sheathing must be supported by and nailed to framing. This edge didn’t land on plates, so install blocking to support it.

Why is blocking staggered?

There are two good reasons to stagger the blocks like this: It makes it easier to nail them, and a plaster wall won’t crack when applied over them. Cracks can develop in plaster if the blocks are nailed in a straight line. Fire blocks are also used to close off one framed area from another.

What is structural blocking?

The primary purpose of blocking is to brace longer frame members such as wall studs against Euler’s bending moment, which is a tendency to buckle under vertical compression. The intervals for the blocks are specified in the building code or as calculated by a structural engineer.