Final Thoughts. In short, drywall should be hung horizontally on residential buildings and vertically on commercial buildings. In the case of either, support beams should always run perpendicular to the wall studs at a distance of 24 inches (61 cm) apart.

Why isn’t drywall hung vertically?

Hides uneven studs – Hanging horizontally also allows the drywall to flow over the framing so that bowed studs create less of a problem. If the drywall were hung vertically and a seam placed on a bowed out stud, the seam would be magnified because of the bump in the wall.

What is the proper way to hang drywall?






Quote from Youtube video: Hold the first sheet horizontal. Against the ceiling and corner and drive a few nails in just to hold it the vertical edges need to attach to studs measure. And mark the next piece.

Does it matter which way you face drywall?

Function. The brown side of drywall should not face out. The other side — which can be gray, green or blue, depending on type — should face outward. Failure to orient the drywall correctly will lead to surfaces that look rough and unfinished even when painted.

Should there be a gap between drywall and floor?

Always leave a 1/2-inch gap at the floor. This allows for floor and wall expansion without cracking the drywall. It also helps prevents moisture wicking if the floor floods.

Should drywall touch the floor?

Drywall should NOT touch the floor. Allow for floor and wall expansion without cracking the drywall by keeping a 1/2-inch (1.27-cm) space between them. This space also aids in preventing moisture from seeping if the floor floods.

How many screws go into a 4×8 sheet of drywall?





Use about 32 drywall screws per sheet of 4-foot by 8-foot drywall installed horizontally on a wall. This total is comprised of four screws on the five middle studs and six screws on each of the two sides.

How far should drywall be off the ceiling?

In fact, when you’re hanging the ceiling, keep in mind that 1/2 in. along the perimeter will be covered by drywall on the walls. And the same is true of inside wall corners. So you can safely cut these pieces 1/4 in.

Do drywall seams have to be on a stud?

Drywall Is Not on a Stud



All edges of all sheets of drywall must land on a solid surface such as a stud. A hanging drywall edge may work in the short-term, but in the long-term it can result in cracks and other serious wall issues. Sometimes, the drywall does not horizontally reach a stud.

Why is drywall installed horizontally?

Drywall panels installed horizontally increase the shear strength of walls. Shear strength is the ability of a wall to resist lateral loads, such as wind. The horizontal installation also reduces the likelihood of sagging in walls, which could lead to cracks and even collapse if it persists.

Do you stagger drywall seams on walls?



Drywall butt joints should always be staggered. This makes it easier for taping and finishing and increases the overall strength of the entire wall.

Should you put drywall on ceiling or wall first?

Hang drywall on the ceiling first, then the walls. Check the ceiling for bowed joists using a 4-ft. level. Irregularities less than 1/8 in.

Do you stagger drywall seams on ceiling?

It’s not necessary to stagger seams on ceiling drywall. However, because these joints are relatively difficult to finish – and tend to be noticeable in the finished product – it’s a good idea to stagger the drywall panels to make the joints less visible.

How big should the gap be between drywall and the floor?



It might sound counter intuitive at first to leave space between your floor and your wall, but you should always leave a ½ inch to ⅝ inch gap between drywall and the floor.