After your existing subfloor is secured do what you can to get your T&G joints to break near the center of the 1X6, running you plywood the same direction as the 1X6, perpendicular to the joists.

Should subfloor be parallel or perpendicular?

Underlayment panels should be installed with the long direction, or strength axis, perpendicular to floor joists, never parallel to the subfloor seams.

Does it matter which way you lay plywood?





It is usually correct to lay sheet material across the direction of the joists, this ensures even distribution of loading on joists, however, plywood is cross laminated so each layer is of different direction providing a strong floor covering.

Which way do you lay a tongue and groove subfloor?

Quote from the video:
Quote from Youtube video: If your panels are tongue and groove they should be butted lightly together with the side marked this side down resting on the supports.

How do you install plywood over subfloor?

Quote from the video:
Quote from Youtube video: Because this is adding some strength especially in an older house like this I want it to be as thick as I can alright. So you have the subfloor. You have the underlayment.

Which way should the grain of plywood subflooring run in relation to the floor joists?

Quote from the video:
Quote from Youtube video: Make sure that the face grain runs across the supports the face grain is going to be located.

How do you lay tongue and groove plywood?





Quote from the video:
Quote from Youtube video: Before you put down a sheet of plywood well really drilling wood here the plywood to the joist.

What goes on top of subfloor?

Underlayment: Some types of flooring can be installed directly on top of the subfloor, such as vinyl flooring. Other types need a middle layer, called underlayment, such as laminate,carpet and tile.

Do you need two layers of subfloor?

The subfloor has to be attached to the joists, and two subfloor layers glued together or just nailed through to the joists, is no different than one thicker subfloor layer.

What do you put between layers of subfloor?

underlayment— a layer between a subfloor and a finished floor that facilitates leveling and adhesion.”

Which direction is plywood the strongest?



direction parallel to grain

Wood is strongest in the direction parallel to grain. Because of this, the strength and stiffness properties of wood structural panels are greater in the direction parallel to the strength axis than perpendicular to it (see Figure 1).

Which side of the plywood faces out?

The side with the stamp is the smoother side. When installed smooth side down, the rough surface will then face up and give the worker traction for safety.

Should plywood underlayment be screwed to joists?



It is nailed or screwed to the joists to secure it completely. Adding fasteners to this layer before laying underlayment helps stabilize and quiet an old floor. Drive screws or nails through the subfloor and into the joists. These screws or nails should go in between the existing fasteners for reinforcement.

Should plywood be glued to the floor joists?

How to Adhere Your Subfloor Panels to Joists. To glue or not to glue? The answer: Glue. Although using a subfloor adhesive (or subfloor glue) is not required by code, it is a standard practice that can help prevent floor squeaks by reducing the chance for movement at the panel-to-joist connection.

Should you glue plywood underlayment to subfloor?

No, you should not glue down your underlayment. Underlayment is is a floating material, the same as your laminate flooring. In most cases, you should not glue or nail your underlayment down. You should always check with the installation instructions of the underlayment for proper installation instructions first.

Should you glue second layer of subfloor?

Adhesives should not be used to fasten the two layers together. Install second layer on top of the first layer inside of the wall studs. A minimum ¼” gap is required between the second layer and wall perimeter.

Do you stagger plywood flooring?



More plywood sheets are nailed down, staggering seams for a stronger fit. When you build, you always stagger. It’s what makes a pile of boards and materials into a solid structure. Stagger stagger.

Should you nail or screw down subfloor?

Ideally, nail down your subfloor using corrosion-resistant nails that will securely hold it in place and last a long time. Screws are a great alternative that you can easily remove, but they are not as sturdy. Screws are superior in terms of reducing floor squeaks, but the installation is slower.