Renovation planning guide: 9 steps to follow before you start

  • Set out your renovating goals.
  • Organise your development application.
  • Be realistic about how much you can afford.
  • Enlist the experts.
  • Avoid overcapitalising on your renovation.
  • Add value to your home with careful planning.
  • Invest in quality key materials.

How do I plan a DIY renovation?

How to Plan a Remodel in 5 Steps

  1. Build a Detailed Home Improvement Project Plan. …
  2. Set a Project Budget. …
  3. Hire Contractors. …
  4. Build a Timeline. …
  5. Pack Up and Prepare for Your Home Renovation. …
  6. Ask Your Contractor Plenty of Questions. …
  7. Plan for Problems When Renovating. …
  8. Complete Structural Projects First.

What order should I renovate?





Generally, most renovations will follow this order of work:

  1. Strip out and removal.
  2. Structural work – floors, ceilings, walls.
  3. First fix work – plumbing, heating wiring.
  4. Plastering, flooring.
  5. Second fix work – plumbing, heating, wiring.
  6. Bathroom, kitchen fit-out.
  7. Decoration.

Where do I start when renovating a house NZ?

A great place to start is the House of the Year website where you will see the best new homes and renovations across all budgets and categories. Work out a budget and decide what is achievable and what is not. It is also a good idea to plan the project room by room.

What is the first step in renovating a house?

Here are 10 common steps to consider.

  1. get a personalized insurance quote today. A great rate is just a few clicks away. …
  2. Make a plan. …
  3. Set a budget. …
  4. Hire a contractor. …
  5. Talk to your insurance company. …
  6. Secure permits and order materials. …
  7. Start demolition. …
  8. Work behind the walls.

What should I renovate first?





This is why experts agree that choosing to remodel your kitchen or bathroom first is traditionally the smartest move. And while kitchens typically cost more to remodel than bathrooms, they tend to yield a better return on investment, so they end up paying for themselves over the long run.

Where do I start when renovating a house?

Renovating a House

  • Find a project.
  • Assess the project’s potential.
  • Make a thorough budgeting plan.
  • Carry out surveys.
  • Take out renovation insurance and a warranty if necessary.
  • Check whether you are eligible for any grants.
  • Find an architect.
  • Apply for planning permission.

Should you do floors or walls first?

Most people think that painting should be done first to prevent any spills from marring brand-new flooring. However, experts agree that new flooring should always be installed before you have any interior painting done.

What does it cost to renovate a house?

Depending on the square footage, the average cost to gut and remodel a house can be anywhere between $100,000 – $200,0004. Gut renovation cost per square foot ranges between $60 – $150 and includes new plumbing, appliances, structural improvements, a new roof and an HVAC (heating, venting, air conditioning system).

What’s the difference between remodeling and renovating?



Remodel vs. renovate
Essentially, the difference between them is that a renovation refers to restoring something to a previous state, while a remodel refers to creating something new.

How long does it take to renovate a house?

“In reality, a complete overhaul takes around 8 to 10 weeks, depending on how much wet works are required.” Wet works include any hacking, tiling, and masonry work. Smaller-scale projects may take between six to eight weeks.

Is $50000 enough to renovate a house?

With $50,000, a homeowner can afford a dream renovation, such as a high-end kitchen remodel that includes top-of-the-line appliances and cabinetry. Another option would be to add to the house’s usable space by turning a screened porch or garage into a fully finished interior room.

Are floors last in a remodel?



2. Once a new hardwood floor is finished, you’ll have to wait at least 30 days before laying anything like a protective painter’s tarp on top of them or you’ll risk “suffocating” the finish.

What goes in first flooring or cabinets?

In most cases, given standard flooring heights, you will install the cabinets before the floor covering. Floor covering, or finish flooring, is the surface that you see and walk on, not the subfloor (under the underlayment) or underlayment (between the subfloor and finished layer).

What comes first ceiling or floor tiles?

You can either start with false ceiling or with floor tiling because both are not inter dependent. But if you go with the tiling first then you need to protect the tiles as for false ceiling you need Aluminum supports, gypsum boards, ties etc.

Should you finish walls or ceiling first?

Hang drywall on the ceiling first, then the walls. Check the ceiling for bowed joists using a 4-ft. level.

Do you tile under a bath?



You Can Tile Under A Freestanding Tub
If you have a soaker or pedestal tub, you can choose whether or not to tile under the whole tub. You could treat a soaker as an alcove tub and tile up to the edge of the base. In that case, the tub would sit on a thin layer of mortar to raise it to the level of the tile.