1. What are the acceptable moisture levels in concrete? Acceptable moisture levels in concrete according to ASTM standard, when testing via ASTM F2170, the RH level of a concrete slab needs to be at or below 75% — unless the flooring system manufacturer provides alternate guidelines.

What is a normal moisture reading for concrete?

MFMA recommends the relative humidity level for a concrete slab for a non-glue-down maple floor system be 85% or lower and for glue down systems the concrete slab relative humidity level should be 75% or lower before installation.

How much moisture should be in basement walls?





A comfortable basement should maintain a humidity level of 30 to 50 percent — however, those may differ depending on your climate.

What is considered dry concrete?

5.5% moisture content

This is a trigger figure used by some product manufacturers to specify when concrete is dry enough to allow their product to be applied to it.

Is humidity bad for concrete?

Decreased strength: When relative humidity levels increase, the compressive strength of concrete decreases, affecting its durability.

How do you know if concrete is dry enough to seal?





During the curing process, which takes about a month (or 28 days to be precise), moisture evaporates and the concrete becomes solid. That’s when you should do the sealing. If you do it before curing is complete, the moisture does not evaporate properly and the pathway won’t have the strength that it should have.

What is considered high humidity in basement?

Although 30 to 50 percent is ideal, anything above 60 percent is considered excessive. If your basement feels damp, it’s probably too humid. You’ll need to take action, or you risk accumulating mold, mildew, and fungal growth and the creation of ideal termite conditions.

Should you run a dehumidifier in the basement all the time?

Basements are more exposed to a constant source of moisture from the external environment; therefore, your dehumidifier should run very frequently. Molds tend to become a problem at a relative humidity of 60% and above. Therefore, we recommend that you keep your basement dehumidifier within a range of 40% to 60%.

Is 70% humidity in basement too high?

A relative humidity level of 70 percent or higher creates the perfect breeding ground for mold growth. Leaving basement mold unchecked could amount to unhealthy indoor air, causing sickness to your family and aggravated upper respiratory issues.

Does concrete walls hold moisture?



Another source that can be thought of as internal is the moisture contained in new concrete after construction. In a typical house, this can amount to 0.2 gallons per square foot of wall, and 0.1 gallons per square foot of floor.

How do you measure moisture in concrete?

When measuring moisture in concrete, the best and most reliable method is to use the ASTM F-2170 testing method. Under this method, you’ll use a thermo-hygrometer with in-situ probes, along with a series of prepared holes, to get readings of relative humidity deep in the concrete slab.

How long does moisture stay in concrete?

Concrete typically takes 24 to 48 hours to dry enough for you to walk or drive on it. However, concrete drying is a continuous and fluid event, and usually reaches its full effective strength after about 28 days. Here are some of the basic facts regarding the question of concrete drying time.

How long does concrete foundation take to dry?



Seven to 28 days

According to Concrete Network, concrete should be allowed to cure for at least seven days before it’s built on. However, waiting longer will greatly reduce the risk of the concrete cracking. Concrete continues to cure up to 28 days after it is poured, at which point it reaches maximum strength.

Is it OK if it rains after pouring concrete?

Rain falling on top of freshly laid concrete can damage the surface and compromise a level and floated finish. Even worse, if too much extra water works its way into the concrete mix, this can result in weak concrete overall.

How long does it take for 4 inches of concrete to cure?

At 28 days, concrete reaches its full strength and hydration is complete. Although the bulk of the hydration process takes place in the hours and days immediately after the pour, concrete needs 28 days to fully dry.

How long do foundation footings need to cure?



28 days

Assuming you are using 3,000-psi concrete for the footings, you should be safe installing the anchors after 28 days in most circumstances. But there are a few things that can greatly alter the “normal” rate of strength gain: concrete temperature and the use of fly ash or admixtures.

What temperature can you pour concrete footings?

Experts agree—the best temperature to pour concrete is between 40° – 60°F. When temperatures dip below 40°F, the chemical reactions that strengthen concrete slow down and can lead to weaker concrete.

How long should foundation cure before backfilling?

28 days



Let the concrete cure for at least a week before backfilling (28 days is best). Place and compact the backfill carefully in partial lifts—don’t dump it all in at once. And if you have to backfill before the floor system is framed, support the walls first with sturdy diagonal bracing.