When remodeling a bathroom What are the steps?

How to Remodel a Bathroom in 7 Steps

  1. Remove Bathroom Fixtures. …
  2. Install the New Shower or Tub. …
  3. Lay the New Flooring. …
  4. Hang Drywall and Start Painting. …
  5. Install Cabinets and Vanity. …
  6. Update Lighting. …
  7. Hook Up the Plumbing.





In what order do you install a bathroom?

The usual bathroom installation stages are:

  1. First fix. The first fix consists of any plumbing and electrical requirements.
  2. Wall coverings. Walls are covered with your choice of tile or wall boards.
  3. Floor coverings. …
  4. Sanitary ware and furniture installation. …
  5. Finishing touches.


How do you prepare a bathroom for remodeling?

Remove Objects from the Bathroom

  1. Begin by removing the soaps, shampoos, razors, washcloths, etc., from the bathtub and the shower.
  2. Remove the toilet cover or anything that you have kept behind the seat.
  3. Take out anything that is below on the sink in the vanity since it may come in between the plumbing job.

How do you install a bathroom step by step?





Quote from the video:
Quote from Youtube video: Off the wall to the front of the frame. And that's going to give us ample room for that soil pipe behind.

What comes first in bathroom remodeling?

The first step in a bathroom remodel is planning out the space, design and materials; this is followed by demolishing the old bathroom fixtures & tile.

Do you tile before or after fitting a bathroom?

The bathroom fitters are unanimous—if you’re looking for a high quality finish, with a better seal against water damage, then always tile the floor first.

Do you install tub or drywall first?

If you’re unsure whether the drywall in your bathroom has such a membrane, it is important to install one before you install your shower surround over drywall.

Does flooring go down before toilet?



If you’re installing a new floor, pedestal sink, and toilet, you should install the laminate flooring first so it’s under the sink and toilet. Because laminate flooring floats above the sub-floor on top of underlayment, it will expand and contract slightly with the temperature and humidity of the room.

Does tub go in before flooring?

The short answer is that standard bathtubs such as alcove and corner bathtubs should always be installed first, followed by the wallboard, the subfloor and the vinyl.

Do you tile first before installing shower?

Tiles should be fitted before the appliances as you want your appliances to sit on the tiles not just being cut around , the only holes that you are going to have are the fixtures for the appliances ex: toilet , basin, shower cubicle, towel rail.”

How do you finish a bathroom?



Quote from the video:
Quote from Youtube video: I used a smaller strip to outline the sides of this round as well keeping clean lines here is going to help you down the road when it's time for new drywall.

Do you have to tile around a bath?

No, it doesn’t have to be. Traditionally, tiles are used in wet areas of a bathroom (around the bath and within the shower enclosure) as a means to waterproof walls but there are now alternative materials to add a decorative, waterproofing to bathroom walls.

What should you not do when remodeling a bathroom?

Read on to find out the 7 most common mistakes made during a bathroom renovation and how you can avoid them in your own home.

  1. Ignoring the Bathroom Fan. 1/8. …
  2. Lacking a Clear Plan. …
  3. Improper Spacing. …
  4. Choosing the Wrong Materials. …
  5. Being Unrealistic About a Budget. …
  6. Overlooking Small Mistakes. …
  7. Losing Focus Toward the End. …
  8. Reno Rules.


What are the stages of a renovation?



Whether it’s a full home addition or remodeling a room in your home, there are five distinct stages you can expect to go through: planning, budgeting, demolition, construction and cleanup.

Should you do floors or walls first?

The answer to the question is, “do the floors first!” Here’s why: Removing and replacing flooring or carpeting is dirty work. If you paint first, and then do floors, there is a good chance that a lot of dirt, dust, sawdust or tile/stone dust will end up on your freshly painted walls and trim.

Are floors last in a remodel?

2. Once a new hardwood floor is finished, you’ll have to wait at least 30 days before laying anything like a protective painter’s tarp on top of them or you’ll risk “suffocating” the finish.

What goes in first flooring or cabinets?

In most cases, given standard flooring heights, you will install the cabinets before the floor covering. Floor covering, or finish flooring, is the surface that you see and walk on, not the subfloor (under the underlayment) or underlayment (between the subfloor and finished layer).

What comes first ceiling or floor tiles?



You can either start with false ceiling or with floor tiling because both are not inter dependent. But if you go with the tiling first then you need to protect the tiles as for false ceiling you need Aluminum supports, gypsum boards, ties etc.