What is the maximum span for a 2×4 floor joist?

Depending on various factors, a 2×4 floor or deck joist can span a maximum of 6′ 7” at 16” spacing or 7’11” at 12” spacing. A 2×4 ceiling joist with 16” spacing has a max span of 7′ 3” and with 24” spacing, the max span is 6” 4”.

What is the effect of increasing the depth of a wooden beam in a floor system?





For a given span, increasing the joist depth results in the greatest increase in basic stiffness. Reduced joist spacing or increased deck thickness generally improves floor performance by increasing assembly stiffness.

How much weight can a 12 ft 2×4 hold?

When standing vertically, such as when it functions as a stud, a 2×4 can hold about 1,000 pounds. A 2×4 can hold up to 40 pounds or 300 pounds when laying on its edge without sagging when laying horizontally.

How long can a 2×4 span without support?

An interior 2×4 beam – made up of two 2x4s nailed together – can span up to 3′ 1” without support beneath a set of joists for a home no greater than 20′ wide and supporting no more than 1 floor. For homes that are 28′ wide, a double 2×4 can support a span of 2′ 8”.

What are the two types of floor system?

Types of Economical Floor Systems for Reinforced Concrete…

  • Flat Plate Slab Floor System.
  • Flat Slab Systems for Buildings.
  • Waffle Slabs.
  • Slabs on Beams.
  • One-way Slab on Beams.
  • One-Way Joist Floor System.





How much weight can a 2×10 support vertically?

In fact, each 2×10 will support 1,200 lbs. To be clear, spans are measured as “clear spans”. That is to say, from face of support to face of support. Also, if your BBQ is located in the middle of the span so that people can stand around the BBQ, then there will be an additional “Live Load” acting on the joists.

How do you build a built up beam?


Quote from Youtube video: Across the width of the beam. And you'd nail each ply to the next one with a minimum of two three and a half inch nails 18 inches on center. Since. You can directly nail into a wood beam.

How far can a 2×4 span for a deck?

2×4 joists spaced 12” on center can span no more than 5’5” between supports. This guideline limits a deck built entirely from 2x4s to a small size, or you would need to add a mid-span support beam. Most deck joists are 16” on center, which allows you to span 1.5 times the depth in feet.

Are 2×4 strong enough for shed floor?



If building on a foundation other than a treated wood frame, you will need to acquire 6 units of 8ft long pressure-treated 2x4s to put under the shed for floor joists, and shorten them to 7′ 6.5”.

How far can a 2×4 deck joist span?

2×4 Deck Joist Can Only Span 5’8″ (1.72m) Between Supports. Either you are limited to a small deck, less than 6′ (1.8m), or you will need a mid-span beam. You can sneak out a few more inches if you set the 2×4’s at 12″ (300mm) on centre, but commonly deck joists are 16″ (400mm) o.c.

Which of the below is problem with floors?

7. Which of the below is a problem with floors? Explanation: Vibration can occur when heavy footsteps and low bass frequencies pass through the floor.

What are the essential requirements of a floor?



Following are the functional requirements of floors in building:

  • Strength and stability.
  • Resistance to weather and ground moisture.
  • Durability and free from maintenance.
  • Fire resistance.
  • Resistance to passage of heat.
  • Resistance to passage of sound.


Why are concrete floors suspended?

Unlike standard ground floor construction, suspended floors are not sitting directly on the ground. This allows air flow and ventilation to prevent the mould and dry rot that would otherwise occur over damp ground. However this air flow can leave the problem of draughts and cold in the house if not insulated correctly.

Do suspended concrete floors need ventilation?

Suspended timber floors should be well ventilated to reduce the risk of timber rot and musty smells. Ideally, there should be vents in the walls on either side of the floor to encourage cross-ventilation and minimise dead areas beneath the floor (Figure 1).

How can I strengthen my concrete floor?



Reinforced concrete is made stronger through reinforcement by steel bars that are embedded in the floor before the concrete is poured over and sets. Reinforcement is extremely beneficial for concrete flooring as it helps reduce the likelihood of tensile stresses, cracking, or structural failure.

What is blinding in construction?

Blinding is a thin layer, usually around 50 mm (2 inches) thick, it is usually a weak concrete i.e Lower Grade of Concrete or sand that is laid above a layer of hardcore to provide a clean, level and dry working surface. Concrete Blinding is the most Common Form of Blinding.

Can you use sharp sand for blinding?

Blinding Sand is a fine (0.25-0.06mm) sand used to “blind” consolidated fill before laying the PVC damp proof membrane in order to prevent puncture of the membrane.



Opening Hours.

Mon-Fri 8:00am – 5:30pm
Christmas Shutdown Closed for 10 working days + Public Holidays

How thick should blinding concrete be?

2 inches



A thin layer, usually around 50 mm (2 inches) thick, of blinding is poured over the hardcore, sealing in the underlying material and levelling off the surface. If a damp-proof membrane (DPM) is to be placed above it, the blinding will help prevent it from becoming damaged by the hardcore.