https://youtu.be/NfRuLlTp5s8

What do you install first in a bathroom remodel?

Tile the shower walls or bathtub enclosure first. Install the wall tile and then work on the floor tile. Use grout for both. Choose a grout that matches or complements the tile.

How do you sequence a bathroom renovation?





Renovate Your Bathroom in Six Easy Steps

  1. Step One: Plan. Think about what you like about your current bathroom and what you want to change. …
  2. Step Two: Get the Team Together. …
  3. Step Three: Disconnect and Demolition. …
  4. Step Four: Rough in. …
  5. Step Five: Install wall and floor finishes. …
  6. Step Six: Fit off, Clean and Decorate.


Which factors should be considered before bathroom remodeling?

8 Important Factors To Consider Before Renovating Your Bathroom

  • Budget – Keep tabs on cost. …
  • Space Available – Be clever in your design. …
  • Style and Design – What look is it you’re hoping to achieve? …
  • Taps – Consider which style would best suit your new bathroom.

What are the steps to building a new bathroom?

Quote from the video:
Quote from Youtube video: So my first step at this point was to cut a hole in the cement foundation. So that I could put a drain for the bathtub. This is quite a bit of work. So I used a jackhammer a sledgehammer.

What comes first tiling or plumbing?





The bathroom fitters are unanimous—if you’re looking for a high quality finish, with a better seal against water damage, then always tile the floor first.

Does tub go in before flooring?

The short answer is that standard bathtubs such as alcove and corner bathtubs should always be installed first, followed by the wallboard, the subfloor and the vinyl.

Where do you start when designing a bathroom?

The view upon entrance: This is an important part of design, so makes a good starting point for your bathroom layout – you want to see the bath or basin first, not the toilet. Choose one key piece: Be it a freestanding bath, heart-stopping vanity unit or a beautifully tiled shower area and build the layout around it.

Where do I start in a new bathroom?

Your first task when designing a new bathroom should be to decide on the best layout for the room. Start with the position of the toilet. Work out where the soil pipe currently enters the room — or where it will enter the room. This should guide you as to the best place for the toilet — you can then work around this.

Does flooring go down before toilet?



If you’re installing a new floor, pedestal sink, and toilet, you should install the laminate flooring first so it’s under the sink and toilet. Because laminate flooring floats above the sub-floor on top of underlayment, it will expand and contract slightly with the temperature and humidity of the room.

How long does it take to install a new bathroom?

While on average it takes around 5 days for a bathroom to be installed, this is going to differ depending on the overall size. Bathroom fitters will certainly work fast, but sometimes you can save a LOT of money by choosing to DIY.

How long does it take to renovate a bathroom?

According to the Housing Industry Association, it takes between 13 and 25 days (on average) to complete a full bathroom installation as part of a renovation. It’s worth noting those days may not be consecutive, there could be a day or two where no one is on site. For example, waiting on waterproofing to set etc.

How long does it take to add a new bathroom?



A more comprehensive renovation typically takes around four and a half to nine weeks. If you add on to the footprint of your home to add a bathroom, then you can expect the job to take quite a bit longer.

Does tub go in before drywall?

Fiberglass and acrylic tub and shower enclosures come with a flanged edge that attaches directly to the wall studs, and the proper way to hide this flange is to install drywall over it. Consequently, enclosures are typically installed on the bare studs.

In what order do you tile a bathroom?

tile your walls first, then install the bath,sink and toilet, check for any leaks, when you are sure there is no leaks THEN tile the floor, and the adhesive you are planning to use, take it back to where you bought it and buy some proper adhesive and grout mate.

When remodeling a kitchen What comes first?

Tear Out and Demolition



1. Tear Out and Demolition. The first step of any kitchen remodel is tear out and demolition. Before you are ready to create a beautiful new space, it is important to demolish and get rid of what’s outdated or worn out.

How do I tile my bathroom floor?

Instructions

  1. Prepare the Subfloor. The bathroom subfloor should be flat, level, and free of damage. …
  2. Install the Uncoupling Tile Membrane. …
  3. Design the Tile Layout. …
  4. Dry-Fit the Tile Layout. …
  5. Cut the Door Jambs. …
  6. Fill the Tile Membrane Cavities. …
  7. Install the Tiles With Thinset. …
  8. Cut the Tile.

What size tile is best for a small bathroom floor?

Bathroom Tile Size Advice: Floors, Walls, Showers & Tubs

Area Recommended Sizes
Small shower floor 1-inch square
Small shower walls 1-inch square to 4-inch square
Moderate or large shower walls 4-inch to 15-inch by 30-inch
Bathroom floor 1-inch square to 12-inch square, or up to large-format

What direction should you lay tile in a small bathroom?

Direction of Tile



If a room is narrow, this further elongates the space, making it appear in longer and narrower than it is. This problem can be solved by installing the tiles on the diagonal. This draws the eye out to the corners of the room, which visually widens the space.

What do you put under tile in a bathroom?



Install a cement-based backer board following the manufacturer’s instructions. This provides a solid surface under the tile that prevents flexing that could lead to cracking. Backer board panels typically measure 3-feet by 5-feet and can be trimmed as needed. To cut backer board, measure and mark the size you need.

Do you need a moisture barrier under ceramic tile?

During patching, most people usually wonder if they would need a moisture barrier under tiles. Well, yes. A moisture barrier should be installed to protect the flooring against moisture or moisture vapor.

What is the best backer board to use in a shower?

Cement board

Cement board is a good, reliable backer board that works well on both floors and walls. Keep in mind that most tile setters err on the side of caution and brush a waterproofing membrane on top of cement board when it is in wet areas like showers or tub surrounds.

Can I use cement board instead of plywood?

Cement backerboard is more stable than plywood in high humidity and other wet environments. It won’t swell and buckle the way that plywood does, so it’s safe to use in mudrooms and bathrooms where things like spills and puddles are normal, as well as in areas with high levels of moisture in the air.

Can I just screw down backer board?

Screw and Joints



Do not use drywall screws as they are not recommended to be used to hold the backer board in place. All of your backer board pieces should be cut before they are placed on​ the floor. Along the perimeter, screws should be installed at least ½ inch from the edge, but no more than 2 1/4 inches.

Can you tile right on plywood?

Tile can be laid on plywood. But do not install tile directly on the plywood subfloor itself. Use an intervening layer of a sheet of thinner plywood.