Do you need to put plywood under cement board?

Because cement board can be used either for floors or walls, the surface below the cement board will vary: Flooring: For ceramic tile floors, the cement board usually rests on a plywood subfloor (minimum 5/8-inch-thick exterior-grade plywood or OSB).

Can I put cement board over plywood?





If you’re working over a wood subfloor, cement board is the right choice for your tile base. No matter what you’re told at a home center, it’s not a good idea to install tile directly over plywood, especially in a damp area like a bathroom.

Does backer board go over plywood?

When you come up against plywood subfloors in the bathroom or other areas of the home, a cement-based backer board must be installed on top of the wood. This provides the tile with a proper installation surface to bond with, offering you the lifetime guarantee that a good tile installation will always provide.

Do you need plywood under durock?

Subfloor should be minimum 5/8″ APA span-rated plywood or OSB with an Exposure 1 classification or better. Minimum 3/4″ APA span- rated plywood or OSB with an Exposure 1 classification or better. Cover base with USG Durock™ Brand Tile Membrane, 15 lb.

Can I just screw down cement board?

Doing this will require that you remove the existing surface material before installing backer board over the studs. Cement board can also be used on countertops when laying tile. However, the process will involve using an extra sheet of backer board. Never use standard screws when installing cement board.

Do you need plywood behind Hardie board for shower?





That seems like a lot. I think you could use 1×6 if they’re spanning 16″ or 24″…but, no, you do not need plywood too, but yes, you should use cement backer board, unless it’s a shower, then I wouldn’t use thinset.

How do you install cement board on a plywood floor?

Instructions

  1. Apply the Mortar Bed. Mix a batch thinset mortar, following the manufacturer’s directions, using a bucket and margin trowel or putty knife. …
  2. Place the First Cement Board Sheet. …
  3. Fasten the First Sheet. …
  4. Install More Sheets. …
  5. Trim the Last Panel. …
  6. Apply Joint Tape. …
  7. Mud the Taped Joints.


What do you put on plywood before tiling?

Thinset is the wet base that you first trowel on the plywood to make the tile stick. Higher latex content is essential for bonding to plywood. A quality unmodified thinset should be used and mixed with a latex additive.

Can you tile directly over plywood?



While you can lay tile directly over a concrete slab using thin-set adhesive, don’t make the mistake of applying tile directly to a plywood subfloor. No matter how firm the subfloor; the plywood will expand and contract at a different rate as the tile, causing cracks to develop in the grout lines or tiles over time.

How do you secure cement board to the floor?

Quote from the video:
Quote from Youtube video: Secure the backer board sheets with screws drilled every six to eight inches. Position the screws one half inch to two inches from the edge of the sheets.

Can you use 1/4 inch cement board on floors?

1/4″ USG Durock® cement board is an ideal substrate for floor and countertop ceramic tile installations. The 1/4″ thickness helps eliminate transition trim when abutting carpet or wood flooring and minimize level variations with other finish materials.

Do u have to put thinset under cement board?



Not only is thinset a critical component underneath cement board but the other critical component is the fasteners. And you won’t have the fasteners if you are trying to install it over concrete. On the bright side, there are some options for concrete subfloors.

Can I use liquid nail on cement board?

LN-907 Liquid Nails is recommended for cement board and most other common building materials. The application temperature is from 22 to 120 Fahrenheit and the service temperature is -20 to 140 degrees Fahrenheit. This makes it ideal for just about any DIY project and on most construction projects.

Can you put cement board on joists?

Do not install HardieBacker Cement Board on joists more than 24” on center. If your floor meets the requirements, the next step is to ensure that it is structurally sound and free of damage. Replace any warped, missing, or uneven sections of flooring so that you have a flat and clean surface.

How long before you can walk on cement board?

This is normally 12 hours but may be up to 24 hours in some cases. After the mortar is dry the backer board is ready to receive the mortar for the tile.

What type of screws do you use for cement board?



Cement board attached to plywood or similar underlayment will hold with only 1 1/4-inch screws; for thick or heavy metal fixtures, use 1 5/8-inch screws. In general, 1 1/2-inch galvanized nails will hold the board firmly in place.

How do you install Hardie backer board on plywood?

Quote from the video:
Quote from Youtube video: To start apply a supporting bed of mortar or modified thinset to your subfloor with your trowel. Using a sliding motion firmly. And evenly embed your Hardiebacker cement board in the wet mortar.

Do I need to thinset under Hardibacker?

However, many manufacturers including, both Durock and Hardiebacker not only recommend that you use thinset under their backerboard, but they specify it and will void the warranty on their product if it’s not used.